October 5
The drywall folks came out and got a heck of a lot done. They hope to have the lion share done today (10/6) and leave any fine work for Monday. Cool.
The drywall folks came out and got a heck of a lot done. They hope to have the lion share done today (10/6) and leave any fine work for Monday. Cool.
We have been waiting and wating on the inspections and they all came through. All but the Valley Park Fire Department one. That took a long time. Apparently they take 7-10 days to get out to a site after they get what information they need. A few things didn't pass the first time around but the contractor was on site the next day when the marhsal came back out to make sure EVERYTHING passed.